Things are starting to come together. The ridge cap was installed on the roof, and but for some missing screws, the roof sheeting is now complete. The grade girt was installed on Line K, as was the door frame for the roll-up door. The framing was installed on Line 9 next to the archives cars with a corresponding door frame. The framing was completed on Line 1 except for the mandoor on the south side. Installation of cladding on the East and North walls will commence shortly.