Thursday, October 29, 2009

Construction Update #68


Ballast was dumped on the #7 switch and the lead in preparation for more surfacing. In addition, the damaged concrete from last weeks pour was jackhammered out in preparation for re-finishing the two slabs on Track 41 & 42. Prep work for "The Big Pour" was also done. All the pieces are slowly falling into place!


Funds to complete 5the last 3 tracks are still needed - Please contribute if you can. Every $20 makes a difference.