The first concrete pour was completed today. We poured the slab between track 46 and the south wall. Notwithstanding a minor "Glitch" with the formwork, the pour went well, and I am pleased with the results. Thanks to everyone who came out to assist - many hands made light work.
Funds are still needed to complete the track in the yard, which is required to get the cars into the barn. Please contribute if you can.