Tuesday, October 27, 2009

Construction Update #66


Saturday was another good day for track construction. Track 46 was laid out outside, and the crossover switch was built. Unfortunately, rain delayed the work again, and production suffered somewhat. By the end of the day, one rail on track 46 was connected to the building - The building was connected to the mainline for the first time. The Ballast car was loaded with ballast for the lead & ladder switches, and material was also prepared for the balance of the trackwork.

No comments: