A lot of groundwork was laid this week for "Track Weekend #1" which is coming up this weekend. The goal is to have 5 of the tracks completed inside the building. At the same time, we will change 60 ties on the mainline. Beyond the trackwork, the forms for the south floor slab are complete, and concrete can be poured as soon as track 46 is built. The pace of the project will soon reach a feverish pace.

Funds for track materials are still needed. Please contribute if you can. We're in the home stretch here, and every $20 helps.