Monday, November 2, 2009

Construction Update #70


We had another busy weekend, and the final pieces of the puzzle are falling into place. The forms on the north floor slab were stripped, and flipped over to form the back of the curf. Face forms for the curb will be borrowed from a curb contractor, and the curb will be poured in the next week or so. Track 45 was lifted and blocked through the doorway, and the slab forms were installed along with the track drain pipe. The ramp leading into the parts area was also formed, and is ready to pour. The balance of the slabs will be poured toward the end of this week.

Prep work for track construction was also done, and there is 270 feet left to construct. It is planned to complete this work this coming weekend.

Funds for track material are atill needed - please contribute if you can.

No comments: