Work on the finishing touches is progressing well. The opening for the last mandoor was cut in the wall, and the door and frame will be installed on Friday. About 2/3 of the interior liner panel on the firewall was installed, and should be complete by Saturday.
Friday, November 21, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment