tag:blogger.com,1999:blog-4527468598030959640.post972935896027392638..comments2013-09-10T00:05:05.321-04:00Comments on Halton County Radial Railway: Construction Update #24Unknownnoreply@blogger.comBlogger2125tag:blogger.com,1999:blog-4527468598030959640.post-14152164077032632312008-10-03T13:58:00.000-04:002008-10-03T13:58:00.000-04:00The two buildings are connected. Initially, the tr...The two buildings are connected. Initially, the tracks will extend eastwards to the ladder and yard track which is already built. The six tracks all line up with the tracks in the existing building, and the existing building already has framed track doors on it's east end. Eventually, the doorways will be opened up, doors installed, and the tracks extended right through. In the short term, the priority is getting track built to get the cars under cover. Overhead in the barn, and on the track leading to it is still a few years away.Tom Twigge-Moleceyhttps://www.blogger.com/profile/17683438789876431445noreply@blogger.comtag:blogger.com,1999:blog-4527468598030959640.post-3301834090422294282008-10-02T15:40:00.000-04:002008-10-02T15:40:00.000-04:00Great little update-blog. Thank you for it.Will th...Great little update-blog. Thank you for it.<BR/><BR/>Will the two barns be connected afterwards to make storage of working streetcars easier? Or will they continue to back up into the barns? A connected pass-through track may be fun to make the trip feel particularly long :)<BR/><BR/>Good luck on the project.Anonymousnoreply@blogger.com